VJIKKS ENGG POWER successfully completed commissioning of Chlorine Gas Dosing System for world’s leading special metal producer 5N PLUS, Canada

VJIKKS ENGG POWER (M) SDN BHD, has been growing from strength to strength by venturing into other industries other than Power Industry.

Having equipped with a team of personnel with strong process knowledge about every system in a conventional Fossil Fuel Fired Power Plants including Combined Cycle Gas Turbine Power Plants, VJIKKS ENGG POWER boldly entered into other industry and secured a project from 5N Plus, Canada in the beginning of the year 2014.

5N Plus ,Canada is the leading producer of specialty metal and chemical products. 5N Plus deploys a range of proprietary and proven technologies to produce products which are used in a number of pharmaceutical, electronic and industrial applications.

5N Plus is setting up a Specialty Refinery Plant in one of the ASEAN countries. The refinery plant requires pure chlorine dosing system, to inject Chlorine in a very fine and controlled manner into Bismuth Refinery Process.

VJIKKS ENGG POWER with their team of personnel having experienced in Electrochlorination and Gas Chlorination system in Power Plants, with a clear and high confidence carried out design, engineering and manufacturing. After delivering all the materials according to the schedule, the installation of the system was also successfully completed as on 9.5.2014.

However, due to some delay in main Bismuth Refinery Plant installation , the commissioning of the Chlorine Gas Dosing system was postponed by customer to April-May 2015.

Having combined with Erection, Commissioning, Operation and Maintenance experience of Power Plants, the system designed, engineered, manufactured and installed by VJIKKS ENGG POWER was successfully commissioned in the month of April –May 2015, together with the main refinery plant and its crucibles.

During commissioning, since it was a new process, there were many challenges to be faced with respect to understanding the actual Bismuth Refinery Process and to modify the logics of Chlorine Gas Dosing system as it affects largely on the quality of Bismuth.

 
 
products
  • Electrochlorinators
  • Any equipment made out of precious materials TITANIUM, TANTALUM, NIOBIUM, ZIRCONIUM, NICKEL, HASTELLOY, MONEL, INCONEL, X-750, PLATINUM, RUTHENIUM, IRIDIUM, PALLADIUM and its alloys
  • Cathodic protection anodes of any shape
  • Alumina Ceramics for Corrosive fluid handling
 
Vjikks Engg Power, Copyrights reserved 2015
. . .
. . .